Challenge

An Australian Generator needed assistance with the combustion tuning of one of their black coal fired boilers. The client reported that the boiler had been experiencing operational issues including high concentrations of carbon monoxide and carbon-in-ash, significant splits in the excess oxygen concentrations, economiser erosion, and under performing heat rate.

Solution

hrl: worked closely with the client to develop a targeted and cost-effective combustion tuning program; with the primary objective to optimise the unit heat rate. hrl: utilised both the mic One online PF distribution and Multipoint Combustion Diagnostic Analysis (MCDA) systems to measure both the relative PF distribution and the resultant combustion gas profile. The combustion tuning program also included the optimisation of the overfire air system; an Australian first for hrl:

Results

As a result of the improvements to and optimisation of the combustion and OFA systems, this Australian Generator has experienced the following benefits:

  • A measurable boiler efficiency improvement, equating to permanent annual fuel savings;
  • Reduction of the excess oxygen setpoint;
  • A reduction of the secondary air flow rate and reduction of associated FD fan power draw;
  • A significant reduction of the flue gas velocity through the economiser; and
  • Reduction of spatial temperature differentials for the secondary superheater and secondary reheater, reducing the risk of overheating.

hrl: estimates that, in general, the total cost savings of combustion tuning could easily exceed $1 million/annum. hrl: is working with this client to assess the potential for the combustion tuning of the remaining units, and additional combustion and operational improvements to improve the unit heat rate.

 

 

 

"Continuation of work done and excellent past dealings." 

Justin Tan

What our clients say:

Are you ready to transform your business performance?

Phone 1800 475 832

Latest News

HRL attends 8th Electricity, Power Generation & IPP Expo, Indonesia 17-18 July 2018

Posted by Dao Nguyen on 16 July 2018
HRL attends 8th Electricity, Power Generation & IPP Expo, Indonesia 17-18 July 2018
HRL is pleased to be an exhibitor at the 8th...
Posted in: Media Release Power Plants Event  
< Previous | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | Next >
 

Sign up: newsletter & updates

 
 

Our certifications

NATA accredited AtS/NZS ISO 17025, AS/NZS ISO 17020NATA Accredited Laboratories number 561.


ISO 9001 Quality Management certied by BSI under certicate number FS605116.

Ready to transform your business performance?

Contact our technical consultants on -
1800 475 832 or info@hrl.com.au to get started today.


See expertise in action:

 
 

Language selector